Friday, December 17, 2010

More... Much More of the Same


The start of pounding in the masses for the Buffer Wall. Two days later the wall, except for one small section was 30 meters deep and up to 5 meters high. We still have a couple meters of lake to dig out.

For those visiting the site, we are stacking the material high, higher than in the plan. It's easier and faster to push and shape the material going downhill, working with gravity than continually pushing it up to achieve the desired height.