Wednesday, February 16, 2011

Lots Done

The site is drying out slowly, and work is moving forward. The drainage crew has been busy on the second hole, having completed the drains in the green, today they put drainage in the long bunker to the left of the green, installed the exit pipe, and shaped the bank of the bunker; nice job guys. They would love to start on the large waste area to the right, but it's a little to wet at the moment. Tomorrow they'll most likely be on fairway 1 and Green1.

The screen for mixing rootzone (photo bottom) has arrived, and the first tons of material have made their way through the machine. More on that in future blogs.

The drainage swale between the 3rd and 4th fairways is complete, the remainder will be done in the not to distant future, Right now a fair bit of traffic goes through the future extension.








Tony Ristola